Timeline

Three hundred years, and three decades of quiet

Every entry below is dated and sourced. Where an agency document and a news report disagree, both appear. Highlighted rows are the four moments that changed what was officially known.

30 entries Last verified 16 November 2026

The shape of the record

Thirty dated entries across three hundred and forty-seven years. Almost all of them fall in the last four decades, and one stretch of twenty-eight years carries no investigation document.

Density of the documented record, 1679 to 2026 Two time axes. The upper shows the full span from 1679. The lower magnifies 1950 onward, where a 28-year stretch carries no investigation document. FULL SPAN · 1679 TO NOW 1679 1800 1900 2026 LE GRIFFON, 1679 MAGNIFIED · 1950 TO NOW 1950 1980 2010 2026 28 YEARS 1992–93 2025–26 1958–62

The shape of the recordThirty dated entries across three hundred and forty-seven years. Almost all of them fall in the last four decades, and one stretch of twenty-eight years carries no investigation document. Hover or tap a band to read it.

Bands mark periods with documents on the record, not continuous activity

  1. 1679

    Le Griffon

    The location is believed to be where René-Robert Cavelier, Sieur de La Salle, built the barque Le Griffon, the first sailing vessel to work the upper Great Lakes. A commemorative rock at Griffon Park, on the mainland shore, marks the story.7

  2. early 1900s

    The west end is first extended with fill

    DEC’s account: the western end of Cayuga Island was extended into the Niagara River using fill.1

  3. 1958–1962

    Extended again, this time with industrial material

    DEC: the western end was extended again between 1958 and 1962 “using fill that included industrial material.”1 This is the origin of everything that follows.

    DEC’s 1984 Phase I report says the western tip was extended 250 yards into the river before 1930 and widened between 1958 and 1962, and that construction “had ceased at least by 1980.”14 The Niagara Gazette, citing DEC’s database, also gives about 250 yards.45

  4. Sep 1984

    DEC’s Phase I report finds no evidence of dumping

    A Phase I Summary Report prepared for DEC by Ecological Analysts, Inc. describes the site as “manmade island extensions.” It describes the fill as “clean fill and industrial materials (sand, abrasives, broken concrete)” and says DEC files list five companies “as having supplied fill” (see How the land was made). That is a record of fill supply, not a finding of liability. Its conclusion: “There is no evidence of any hazardous waste being dumped onsite.” It gave the site a hazard ranking score of 0.00.14 DEC posted the report publicly on 17 September 2026.

  5. 1985

    A joint DEC, EPA and USGS report

    The Niagara Gazette reports that DEC, EPA and the U.S. Geological Survey issued a joint report in 1985 confirming toxic chemicals at the site, and judging its potential for contaminant migration to the Niagara River “probably” major.4 EPA’s library dates the report to 1985.20 Its conclusion and the 1984 Phase I report’s point in different directions; both are shown here.

  6. 1 May 1988

    Phase I report, Griffon Park

    The first investigation document in DEC’s file for Griffon Park — site 932081, on the mainland shore across the Little River.8

  7. 1992 & 1993

    DEC and DOH assess the island, and notify every owner

    DEC, working with the Department of Health, conducted site assessments and sampling. The assessments “identified sporadic contamination of mercury, pesticides, and other contaminants in surface and subsurface soils.”1

    Notices detailing the contaminant levels were provided to each property owner, and owners were told to contact DEC or DOH before doing ground-intrusive work on their properties.1 This is the fact that makes the 2025 discovery a rediscovery.

    The reports themselves were posted on 17 September 2026. The 1992 assessment drilled 18 borings and found fill containing “concrete fragments, trace metal fragments, tar paper, brick fragments, asphalt, trash, slag, ash and cinders.” It concluded that the elevated levels in the western area “do not appear to be a health concern based on normal use”, but that “exposure to excavated fill may pose a potential health risk.” The 1993 supplement did not confirm the earlier lead and PCB results, but did confirm mercury, and concluded: “due to the elevated levels of pesticides detected in the surface and shallow subsurface soils of the western portion of the island, risk to human health may be a concern.”1516

    The 1993 report ties the unconfirmed PCB result to boring S-5 in its results section and to S-8 in its conclusions.

  8. 1 Nov 1993

    Preliminary Site Assessment, Griffon Park

    A two-volume PSA is filed for site 932081.8

  9. 1993–2021

    The gap

    No investigation document for the Cayuga Island site appears in DEC’s public folder for this period; after the April 1993 supplemental report, the folder holds nothing until the February 2026 fact sheet.9 DEC’s 2026 fact sheet says the site was delisted from the state Registry in 1995,1 and DEC told the Gazette its last completed investigation was that year, when it designated the western end Class N.4 The Gazette describes attention as having waned “for roughly two decades” until testing resumed in autumn 2025.4 An environmental attorney, Christen Civiletto, called the delay “alarming” and “inexcusable,” noting that families “had no idea”4 what was in the soil below their homes. DEC says notices went to every owner in 1992–93.1

  10. 23 Feb –
    23 Mar 2022

    Griffon Park: five monitoring wells, and fill 5 to 17 feet down

    Under DEC’s Inactive Landfill Initiative, five new monitoring wells were installed, developed and sampled at Griffon Park. Fill material was identified in five borings at depths between 5 and 17 feet below ground surface, including clear and brown glass, metal, cloth, brick fragments, cinder and wood.10

    This is across the Little River from the island, not on it — but it is the most specific published description of what mid-century fill in this neighbourhood actually contains.

  11. Mar 2023

    Griffon Park field and summary reports posted

    DEC posts the Inactive Landfill Initiative summary report (1 March) and field activities report (9 March) for site 932081.8

  12. Oct 2025

    A crew smells something in the right-of-way

    A contractor working for the Niagara Falls Water Board drills soil borings in the West Rivershore Drive right-of-way ahead of water-main placement and reports a chemical odour in the ground. Subsurface samples submitted to DEC show “elevated levels of several contaminants related to industrial material.”1

    Local reporting identifies the firm as CPL Engineering and says two borings were involved.5 DEC follows up by collecting its own soil samples from the same right-of-way.1 DEC’s February 2026 fact sheet dates that sampling to October 2025 (February 2026 fact sheet).

  13. early Dec 2025

    Results come back above residential screening levels

    DEC receives its results. They are “consistent with historical data” and show “exceedances of DEC screening levels in residential settings for several contaminants.”1

    DEC cites three reasons for acting now: the new data, the historic use of fill in creating the island, and revised requirements for addressing contamination.1 The standards changed, not only the evidence.

  14. Feb 2026

    DEC contacts property owners on the westernmost tip

    Outreach begins to potentially impacted owners, offering a three-part sampling programme: surface soil, sub-slab soil vapour with indoor air, and sump water.1

  15. 9 Feb 2026

    First public fact sheet

    DEC posts “Investigation” to the site 932008 document folder — the only document in the public file at the time.9

  16. spring 2026

    Sampling at properties that granted access

    DEC’s contractor collects soil, sub-slab soil vapour, indoor air and sump water samples at properties whose owners provided voluntary access. Results are “provided directly to the property owners.”1 DEC had anticipated completing this phase in spring 2026.5

  17. Jun 2026

    A community meeting, and a public disagreement

    Roughly 22 affected property owners attend a meeting at the LaSalle branch library.5 Mayor Robert Restaino says of the state: “The New York State DEC is on this project, and I am sure they will do all they can to attend to what is there and have remediation of what is there.”5 DEC Region 9 Director Chad Staniszewski confirms the agencies are evaluating potential health risks.5

    Assemblyman Angelo J. Morinello asks residents to cooperate. Property owner and former FBI agent J. Gary DiLaura publicly disputes that any danger exists.6

  18. 17 Jun 2026

    Griffon Park samples reach the laboratory

    Soil, sediment and groundwater samples from Griffon Park are received by Pace Analytical Services in East Longmeadow, Massachusetts, submitted by LaBella Associates of Rochester on DEC’s behalf. The analytical suite covers volatile and semivolatile organics, 1,4-dioxane, organochlorine pesticides, PCBs, total metals, anions and general chemistry.11

  19. 23 & 29
    Jul 2026

    Griffon Park results posted — and labelled unvalidated

    DEC posts a July 2026 analytical report explicitly marked unvalidated, and a sampling summary memo.8 Because DEC itself has not validated that data, no findings from it are summarised on this site.

  20. 1 Sep 2026

    Impacts confirmed indoors; a second phase begins

    DEC posts West Cayuga Island — Site Investigation Update. Findings from participating properties to date “confirmed some impacts to indoor air and soil.” Property-specific mitigation plans are “underway.” DEC and DOH “are beginning a second phase of investigations,” with offers to be extended to additional properties along West Rivershore Drive. All work is “at no cost to the homeowner.”1

  21. 8 Sep 2026

    DEC asks 12 more owners for access

    According to The Buffalo News, DEC reached out to 12 more property owners just east of the first 22, and four granted access. DEC said historical aerial photographs suggest filling may have occurred further east, and that “we have not hit clean (soil) yet, as far east as we were able to sample.”18

  22. 17 Sep 2026

    The 1984, 1992 and 1993 reports go online

    DEC posts three historical reports to the public folder for site 932008: the 1984 Phase I Summary Report, the 1992 Preliminary Site Assessment and its 1993 Supplemental. They are the first investigation reports posted for the island, and the folder now holds five documents.9141516 See the document library.

  23. 25 Sep 2026

    The Buffalo News reports the investigation has widened

    The paper reports that 7 of the first 22 owners granted access. One of those seven homes had unhealthy indoor air, and DEC installed a system to vent it. All seven had unsafe soil levels of mercury and pesticide chemicals and will have the top 2 feet of soil replaced, over an orange marker layer, with work expected in 2027. DEC said river sediments around the island showed none of the same chemicals, and that its attorneys are still “trying to seek information from who we consider potential responsible parties.” The article also gives concentration figures from DEC data shared with the paper. DEC has not published them, so they are not repeated here.18

  24. 10 Oct 2026

    A property owner disputes the account

    Commentary

    In a blog post, island property owner J. Gary DiLaura writes that DEC told him “there will be no more tests unless requested by homeowners”, that it tested “the six who requested”, and that it has “no intention of placing the Island on any lists.” He quotes a 9 December 1994 DEC letter approving a petition to delist the island. This is one person’s account of his conversations with DEC. It conflicts with The Buffalo News report, and DEC has published nothing that settles the point.1918

  25. Oct 2026

    The state database lists six contaminants

    As checked on 28 October 2026, the state remediation database record for site 932008 lists alpha-BHC, beta-BHC, mercury, trichloroethene (TCE), cis-1,2-dichloroethene and 1,1-dichloroethene, under a “Site Characterization” project dated April 1993. The record does not show when the list was entered, so it is dated here by when it was checked.17

  26. 27 Oct 2026

    A community meeting on several Niagara Falls sites

    Reporting

    Residents met at the Frontier Fire Hall about contamination at several Niagara Falls sites. A Cayuga Island resident told Spectrum News: “I want to know if it’s my yard. I want to know if it’s my basement.” Spectrum News 1, 28 Oct 2026. The same day the Niagara Falls Reporter reposted J. Gary DiLaura’s commentary, which describes the extension as “250 acres”; DEC’s 1984 report says 250 yards (Commentary: Niagara Falls Reporter).

  27. 28 Oct 2026

    This record starts an updates feed

    The Cayuga Island Record publishes its first dated update, Cayuga Island contamination: what we know. New agency documents and corrections will be noted there as they appear.

  28. 2 Nov 2026

    Second update: the 1984–1993 reports explained

    The Cayuga Island Record publishes a walk-through of the three historical reports. A recheck of DEC’s folder and the state database found no new documents.

  29. 9 Nov 2026

    Explainer: Class P and the Superfund question

    The Cayuga Island Record publishes an explainer on the island’s classification. A recheck of DEC’s folder and the state database found no new documents.

  30. 16 Nov 2026

    Resident guide: how testing works

    The Cayuga Island Record publishes a step-by-step guide to the state’s free testing offer. A recheck of DEC’s folder and the state database found no new documents.

Sources on this page

  1. NYSDEC, West Cayuga Island — Site Investigation Update (1 September 2026). Primary
  2. Mark Scheer, “Two decades since DEC last probed Cayuga Island contaminants”, Niagara Gazette, 20 June 2026. Full text reposted by Niagara Express, 18 July 2026. Reporting
  3. Mark Scheer, “DEC: chemical sampling underway on west end of Cayuga Island”, Niagara Gazette, 15 June 2026. Reporting
  4. Dave McKinley, “Investigation into Cayuga Island contaminants continue”, WGRZ, 17 June 2026. Reporting
  5. Niagara Falls USA, Griffon Park & Boat Dock; Wikipedia, Cayuga Island. Background
  6. NYSDEC document folder, site 932081, Griffon Park. Primary
  7. NYSDEC document folder, site 932008, Cayuga Island. Primary
  8. NYSDEC, Field Activities Report — Inactive Landfill Initiative, Griffon Park, 9 March 2023. Primary
  9. NYSDEC / Pace Analytical Services, Griffon Park July 2026 Analytical Report (unvalidated), 23 July 2026. Primary
  10. Ecological Analysts, Inc. for NYSDEC, Phase I Summary Report, Cayuga Island, site 932008, September 1984. Posted to DEC’s site folder 17 September 2026. Primary
  11. Dvirka and Bartilucci for NYSDEC, Preliminary Site Assessment, Cayuga Island Site, July 1992. Posted 17 September 2026. Primary
  12. Dvirka and Bartilucci for NYSDEC, Preliminary Site Assessment Supplemental Investigation Report, April 1993. Posted 17 September 2026. Primary
  13. New York State Open Data, Environmental Remediation Sites, record for program 932008, checked 28 October 2026. Primary
  14. Mackenzie Shuman, The Buffalo News, “Investigation into pollution widens on Niagara Falls’ Cayuga Island”, 25 September 2026 (syndicated by Chemical Processing). Reporting
  15. J. Gary DiLaura, “The real contamination is in the reporting”, personal blog, 10 October 2026. Commentary
  16. U.S. Geological Survey, U.S. EPA and NYSDEC, Preliminary Evaluation of Chemical Migration to Groundwater and the Niagara River from Selected Waste-Disposal Sites, 1985 (EPA library record). Primary